Overview

Project: BYD showroom

Location: Trench, Telford

ROI: Estimated 4 years


The brief:

CES, in partnership with an external contractor, is delivering a 237kWp solar PV system where part of the existing workshop is being converted into a flagship BYD showroom. The project also includes a maintenance building specifically for BYD vehicles.

This project supports the Greenhous group’s expansion into the electric vehicle market through their BYD dealership which demonstrates the integration of renewable energy solutions with electric vehicle infrastructure.

The addition of the BYD facility enhances the diversity of the showroom’s brands and aligns with their sustainability goals and the evolving needs of customers.

A CES engineer dressed in PPE works on the installation of solar panels.

Powering the next generation of EV charging:

The new 237kWp solar PV system has been designed to power a comprehensive charging infrastructure at the site, including circa 200kW of chargers to support both showroom operations and customer vehicle charging. As the BYD facility continues to develop, CES will support the integration of innovative new charging technology, further details of which will be revealed at a later date. This approach ensures the facility remains at the forefront of electric vehicle infrastructure.

By integrating CES’s renewable energy capabilities with BYD’s innovative electric vehicle line-up, the partnership demonstrates a commitment to sustainable electrified fleet solutions. The new system will power not only the showroom but also the dedicated BYD servicing and maintenance facilities, creating a comprehensive, sustainability-focused dealership that serves both retail and fleet customers across the region.

The collaboration between CES and the Greenhous group represents a significant milestone in the region’s electric vehicle infrastructure development.


The challenge:

The project presents several unique challenges:

  • Installing a substantial 237kWp system across multiple building structures
  • Coordinating with local network providers for an upgraded power supply
  • Executing the installation in four distinct phases while maintaining site operations
  • Adapting the installation to accommodate hipped roofs on the main showroom

The CES solution:

CES is delivering a comprehensive 237kWp solar PV system that will:

  • Provide substantial renewable energy to power the BYD showroom and maintenance operations
  • Utilise premium SunPower P7 panels and SMA inverters for optimal performance and reliability
  • Be installed across multiple roof areas, with a phased approach to minimise disruption
  • Include consultancy services for network connection and supply upgrades

Looking down at newly installed solar panels on top of a corrugated roof. An engineer can be seen in the background.


Project timeline:

The project is being executed in three phases:

  • Phase 1: Showroom with hipped roofs
  • Phase 2: Installation on the largest roof area (completed December 2025)
  • Phase 3: New supply to support generation and BYD megawatt (MW) charger
  • Phase 4: Internal works and energisation

Key project highlights:

  • Significant 237kWp system supporting electric vehicle showroom and maintenance facilities
  • Complex installation across multiple building structures
  • Integration with BYD electric vehicle infrastructure
  • Professional consultancy on network connections and supply upgrades

Looking along a corrugated roof, showing the newly installed solar panels.


Why this project stands out:

This installation demonstrates how renewable energy solutions can be effectively integrated into electric vehicle facilities, supporting both operational requirements and sustainability goals. The project showcases CES’s ability to handle complex installations with spatial constraints and implement phased approaches to accommodate client timelines.


Future impact:

The client appreciated the CES team’s flexibility and willingness to work around other contractors’ deadlines to keep the new build on schedule.

  • Supporting the growth of electric vehicle infrastructure in the region
  • Demonstrating the feasibility of significant solar PV installations for automotive showrooms
  • Showcasing the environmental credentials of the Greenhous group and their BYD dealership

Ready to future-proof your business? Get in touch with us today.

If you would like to talk to us about upgrading your business’ current electrical infrastructure, or you want to learn more about how we can decarbonise your business, contact us. Please fill in the contact form below and a member of the team will be in touch. Alternatively, give us a call on 01743 850067.

This field is for validation purposes and should be left unchanged.
Book a free consultation
Click to access the login or register cheese